ConserveAgendas 2013/03/26
Orleans Conservation Commission

Work Meeting    Nauset Room                     March 26, 2013
8:30 a.m.       Call to Order   

Continuations
Last Heard 3/19/13
Michael J. & Elizabeth A. Jones                                 32 Shore View Drive
by Ryder & Wilcox, Inc. Assessor’s Map 44, Parcel 125.  The proposed addition & renovations to an existing single family dwelling & the replacement of an existing septic tank.  Work will occur within 100’ of Two Inland Vegetated Wetlands.  

Last Heard 3/19/13
Timothy & Andrea Howell                                         25 Cheney Road
by Ryder Wilcox, Inc. Assessor’s Map 42, Parcel 1.  The proposed reconstruction of an existing 4’ by 20’ licensed pier, & the reconfiguration & replacement of a float.  Work will occur on Land Under the Ocean, on Land Subject to Coastal Storm Flowage, on a Coastal Beach, & within the Pleasant Bay A.C.E.C.  

Last Heard 3/19/13
Tamara Fouche-Gamache                                           77 Towhee Lane
by Ryder & Wilcox, Inc. Assessor’s Map 93, Parcel 4.  The proposed construction of a patio & the replacement of an existing timber stairway.  Work will occur within 100’ of the Top of a Coastal Bank, on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.    

Last Heard 3/19/13
Cape Tradewinds II Realty Trust                                 8 Canal Road
by Coastal Engineering Company, Inc. Assessor’s Map 18, Parcel 21.  The proposed installation of a 1,000 gallon grease trap, 2,500 gallon septic tank, & associated piping, & the repaving of disturbed areas to replace an existing cesspool.  Work will occur within 100’ of the Top of a Coastal Bank.

Administrative Reviews
Orleans Conservation Trust                                      13 Champlain Rd
The proposed installation of a wooden 14’ long x 4’ wide walking footbridge. The project will take place within 50 feet of a Wetland.

Orleans Conservation Trust                                      11 Drummond Road
The proposed installation of a wooden 20’ long x 4’ wide walking footbridge. The project will take place within 50 feet of a Wetland.

Mike Losordo                                            57 Davis Road
The proposed regrading of the front of an existing garage.  Work will occur within 100’ of the Edge of Sarah’s Pond.  Work to be done by applicant.  

Jim Bast                                                        128 Monument Road
The proposed removal of a storm damaged maple and pruning of trees.  Work will occur within 100’ of the Edge of a Cranberry Bog.  Work to be done by A to Z Treez.  

Linda Scholle                                           7 Lockwood Lane
The proposed removal of 10-15 trees.  Work will occur within 100’ of the Edge of Paw Wah Pond and within the Pleasant Bay A.C.E.C.  Work to be done by Stephen Tringale.  

Peter Fellman                                           8 Tides End Lane
The proposed installation of a 3’x6’ gravel generator pad.  Work will occur within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, and within the Pleasant Bay A.C.E.C.  

Richard & Elizabeth Cryer                                       52 Willie Atwood Road
The proposed replacement of a skylight with a 10’ shed dormer and the installation of two skylights.  Work will occur within 100’ of the Edge of Wetland and Land Subject to Coastal Storm Flowage.  

Eric & Reva Fischman                                    27 Ruggles Road
The proposed disassembling of stone retaining walls; removal of burning bush and replacement with native species; installation of retaining walls and salt water pool; rebuilding of stone walls alongside pool; replacement of existing patio with new stone; installation of a grill area; installation of drywells to connect to existing downspouts; and shaping of existing wooden deck.  Work will occur on a Coastal Bank, in Land Subject to Coastal Storm Flowage, and within the buffer zone of the Top of a Coastal Bank.  

Ralph Sawyer                                            39 Chase Lane
The proposed removal of a brush pile, broken top of an oak, and a fallen tree.  Work will occur within 100’ of the Edge of a Wetland.  Work to be done by A to Z Treez.

Gary Brusseau                                           11 Center Place Unit H
The proposed continuation of a garden bed including the removal of 4 standing locusts; 18 maple saplings; one cherry tree; removal of underbrush; trimming of two maples; removal of underbrush; and installation of 6-12” of loam, and the opening of a view to the pond including the removal of 3 locusts; removal of downed trees; and the mowing of briars to create a view corridor.  Work will occur within 100’ of the Edge of Boland Pond and the Edge of Wetland.  Work to be done by A to Z Treez.  

Dan Bloomer                                                     11 Richwood Farm Lane
The proposed removal of 5 trees near house and removal of downed trees from recent storm.  Work will occur within 100’ of the Edge of Wetland.  

Andrea Reed                                                     6 Crystal Lake Drive
The proposed removal of a storm damaged red maple and black cherry tree.  Work will occur within 100’ of the Top of Bank. Work to be done by Bartlett Tree Experts.


Basil Bourque                                           7 Blossom Lane
The proposed maintenance of an existing view corridor and the removal of 2 storm damaged cedars.  Work will occur within 100’ of the Top of a Coastal Bank and within the Pleasant Bay A.C.E.C.  Work to be done by Bartlett Tree Experts.  

Kathi Whitaker                                          176 Quanset Road
The proposed emergency dike repair including  stabilizing the undercutting of the existing dike from recent storm events.  Work will occur within Land Subject to Coastal Storm Flowage, Salt Marsh, the Pleasant Bay A.C.E.C., and within 100’ of the Top of a Coastal Bank.  

Andrew Covell                                           47 Woodsneck Road
The proposed removal of 3 storm damaged pine trees, one diseased cherry tree, and the pruning of another cherry tree.  Work will occur within 100’ of the Top of a Coastal Bank and within the Pleasant Bay A.C.E.C.  

Julie Barnwell                                          33 Granny’s Lane        
The proposed removal of a fallen tree, a dead tree, and trees adjacent to the house. Work will occur within 100’ to the Edge of Wetland.

Chris Frey                                                      71 Briar Springs Road
The proposed of 4 broken cedar branches.  Work will occur within 100’ of the Top of a Coastal Bank and within Land Subject to Coastal Storm Flowage and the Pleasant Bay A.C.E.C.

Scott Greico                                                    119 Beach Road
The proposed removal of 5 trees.  Work will occur within 100’ of the Edge of Wetland and an Unnamed Pond.  Work to be done by All Seasons Landscaping.  

Chair’s Business
Approval of the minutes from February 19, 2013.

Other Business

Administrator’s Business

Site Visits

Eric & Helen Dicke                                              66 David Road
by Land Design Associates.  Assessor’s Map 89, Parcel 18.  The proposed construction of a single family dwelling & the removal of invasive species.  Work will occur within 100’ of the Edge of an Unnamed Pond & the Edge of a Wetland.    




Steven Vorel                                                    5 Little Marsh Lane
by Ryder & Wilcox, Inc. Assessor’s Map 69, Parcel 43.  The proposed installation of a Title 5 septic system to replace an existing failed system & the pumping & filling of the existing leaching pit.  Work will occur within 100’ of the Edge of an Inland Wetland.

Philip & Janine Howarth                                 20 Snow Way
by Ryder & Wilcox, Inc. Assessor’s Map 5 Parcel 22. The proposed construction of a guesthouse/boat barn, pool house, tennis court, driveway, & installation of underground utilities; & the proposed management of invasive species has been amended to expand the scope of the Land Management Plan to include southern portions of the property. Work will occur in the buffer zone to an inland pond, Intermittent stream, Bordering Vegetative Wetland, Top of a Coastal Bank, on a Costal Bank, on Land Subject to Coastal Storm Flowage, in a Salt Marsh & in a Bordering Vegetated Wetland.

NSTAR Electric                                          15 Bog Hollow Road
by Environmental Consulting & Restoration LLC, Assessor’s Map 39, Parcel 21.  The proposed after the fact installation of a chain link fence & continued maintenance of the facility.  Work has occurred within 100’ of the Edge of Wetland & the Edge of Hurley’s Bog.

Rita Kneeland                                           16 Driftwood Lane
by Ryder & Wilcox, Inc. Assessor’s Map 27, Parcel 26.  The proposed pumping & abandonment of existing cesspools & the installation of a new septic system.  Work will occur within 100’ of the Top of a Coastal Bank.  


The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.